BRIDGE FORMWORK // KUALA LUMPUR ⇒ TOLEDO, OHIO

To balance time lost during construction a cement formwork (3,500 cbm) was reused for the deck for the Maumee Bridge. It was stored in Malaysia unsorted in 25,000 single units. Under time pressure the parts had to be made ready for transportation and delivered on time as this was part of the contract of sale.